QuotationsFreeUpdated August 2026

Manufacturing Quotation Template

Free manufacturing quotation template for factories to quote tooling, production runs, materials, and unit pricing to procurement clients. Fill in the fields to customize your document, then open it in the editor to edit any text, use the AI assistant to rewrite, and export as PDF or Word.

Quotations

Customize variables

Fill in the parameters below. The preview paper will update dynamically in real time.

Guest Access: 0/5 Free Documents Created
5 Free Left

Guests get 5 free document creations before signing in

Share:

Template Quality Guarantee

Formatted to standard invoice audit configurations.
Export to PDF and Word instantly, even offline.

Live Document PreviewLive

Acme Global Inc.
535 Mission Street, 14th Floor, San Francisco, CA 94105
contact@acmeglobal.com
+1 (555) 382-9281
MANUFACTURING QUOTATION
MANUFACTURING QUOTATION

Quote #: QT-2026-0148 Date: July 3, 2026 Valid until: 2026-08-30

Prepared for John Doe Services by Acme Global Inc. for production of part Manufacturing part Number.

Quotation Details
ItemDescriptionQtyUnit PriceAmount
Injection Mold ToolingSingle-cavity hardened steel mold1$14,500.00$14,500.00
Raw Material (ABS)Industrial-grade resin per kg1,200 kg$3.20$3,840.00
Production RunMolding cycle & labor per unit10,000$0.85$8,500.00
Quality InspectionCMM dimensional QC & reporting1 lot$1,150.00$1,150.00
Packaging & PalletizingCartons, shrink wrap, pallets1 lot$720.00$720.00
Total$858.27

Subtotal: $4,250.00 Tax (15): 8% Grand Total: $858.27

Terms & Conditions
  • Quotation valid for 30 days; tooling lead time is 6-8 weeks after PO.
  • Payment terms: 50% tooling deposit, balance Net 30 on shipment.
  • Parts warranted against manufacturing defects for 12 months.

Notes: Payment is due within 30 days of invoice date.

Quoted prices assume approved engineering drawings and confirmed volumes.
Acme Global Inc.

This free Manufacturing Quotation template is a ready-to-use document you can fill in, export and send today. Free manufacturing quotation template for factories to quote tooling, production runs, materials, and unit pricing to procurement clients. Use it to put a fixed, itemised price in front of a buyer with an expiry date attached. Every field is editable, the preview updates as you type, and the finished file downloads as PDF or Word with no watermark and no sign-up.

Who this Manufacturing Quotation template is for

  • Trades and service businesses pricing defined jobs
  • Agencies and freelancers quoting a scoped engagement
  • Suppliers responding to a request for pricing

What's included in this Manufacturing Quotation template

  • Company name
  • Client name
  • Quote number
  • Quote date
  • Valid until
  • Part number
  • Subtotal
  • Tax rate
  • Tax
  • Grand total
  • Notes

How to use this Manufacturing Quotation template

  1. 1Restate in one line what the client asked for — it proves you listened.
  2. 2Itemise: description, quantity, unit price, line total.
  3. 3Write what is included, then write what is explicitly excluded.
  4. 4State a validity period. Thirty days is standard.
  5. 5Add an acceptance signature line, which turns the quote into an order.

Manufacturing Quotation: mistakes to avoid

  • Write the exclusions before the inclusions. It shows you where the project leaks.
  • Always show tax on its own line. A tax-inclusive total hides your rate.
  • A lone total invites "cheaper?". An itemised one invites "what can we remove?".
  • Carry the accepted line items straight into the invoice, word for word.

Frequently asked questions

How long should a Manufacturing Quotation stay valid?

State an explicit validity period — thirty days is standard. Without it a client can accept your price months later, after your costs have risen. The expiry also creates gentle urgency without you discounting.

What is the difference between a quotation and an estimate?

A quotation is a fixed price for defined work and is generally binding once accepted within its validity period. An estimate is an approximation that may change as the scope firms up.

Should tax be shown separately?

Always. A tax-inclusive total hides your actual rate and confuses the client's finance team. Show taxable value, rate, tax amount and grand total on separate lines.

Can I turn it into an invoice once accepted?

Yes, and you should reuse the same descriptions and numbers. Rewriting them introduces discrepancies that delay payment.